On-site dehumidifier for water infiltration in a building under renovation

What was the customer’s problem?

Water infiltration in the roof slowed down the construction of a new 1365M² winegrowing building. In response, we installed dehumidifiers and a heating system to sanitize the building and allow work to resume.

Equipment set-up and field action

We installed a 185 kW hot air generator positioned outside the building and operating on air recirculation, as well as 8 1080 m³/h dehumidifiers with a dehumidification capacity of 120L at 30°C and 80% RH. Each dehumidifier is fitted with a condensing hose for total autonomy.

Fast, efficient response

It took just one day to install all the equipment. A team of 2 technicians was on hand. Ask us for advice on dehumidifier rental.