Rental of 5 oil-fired generators with over 270 m of assembled ductwork up to the 9th floor of a building.
Maintain a temperature of 25°C inside the building at -7°C outside for equipment storage
Polypoles was tasked with maintaining a minimum of 5° in a 5-storey building under construction.
To store spare parts in a marquee and prevent them from deteriorating over the winter period.
Heat a small tent quickly and efficiently, with no air movement.
HOT TOP infrared heater
Polypoles was asked to heat a structure used as changing rooms and a training room by the LOSC soccer team.
Since 2019, we have been providing temporary heating services for two major structures